Author:

Cabrini College

HRA has completed dozens of projects for Cabrini College over the past 10 years.

Renovations of Grace hall second floor. Conversion of 30+ faculty offices
and storage areas to student housing. Includes all upgrades of sprinklers
and life safety systems and mechanicals. Construction of multiple men’s and
women lavatories and shower rooms.

Cabrini College: Jazzman’s café. Complete demolition of existing cafeteria
space. Total renovation including all underground mechanicals, fixtures and
finishes, soffits, curtain wall. Work completed on a fast-track basis ahead
of schedule and on budget.

Hatboro YMCA

Construction of three- stop elevator in the center of the existing structures. Challenges include performing all of the work while the facility was in operation without risk to emplyees or the public. Core work comprised hand excavation of 12’deep elevator pit, underpinning existing foundations, and construction of the CMU elevator tower to connect lower gymnasium, entry lobby and upper fitness room. HRA has performed multiple projects for the YMCA’s of the greater Phila. vicinity.

Trumark Financial

TruMark

Construction of Trumark Financial drive through at the home office. Work included all excavation and construction of three bay drive through bays with underground vacuum tube system and ATM kiosk. Included all interior back counter work while bank was in operation. Project was successfully completed on schedule, on budget, without accidents or security issues.

A.I duPont Hospital for Children

HRA has completed multiple projects for this client including renovations to Laboratories, offices, patient care areas, children’s advocacy center, out patient lobby, and executive offices.

A.I duPont Hospital for Children:
Early learning center: Renovations including wall relocations, doors and
interior windows, Paint, flooring,design features, sinks and fixtures.

Dairy Cottage

Construction and renovation of Dairy Cottage restaurant in Springfield, Pa. Work included a two story addition which doubled the size of the building. An entire new commercial kitchen and lower level prep kitchen, all site work, curbing, masonry, and fire protection were included in this project.